Cognition Land and Water was contracted by Homes England to complete works at a site, formerly known as Imerys China Clay, Marsh Mills, in Coypool, Plymouth. The site was to be redeveloped to accommodate 560 new homes, a social centre, kindergarten and a school.
For more than a century, the 70-acre site was used for the industrial production of China Clay. This resulted in a legacy of derelict buildings, naturally occurring radiation material (NORM), asbestos containing materials and ground contamination (hydrocarbons) at the site. Additional development constraints included a strict tree protection order (TPO) on all mature trees, numerous protected species (bats, badgers, slow worms, reptiles), sensitive surface water course (River Plym), and offered home for around 150 deer[AB1] , which freely migrated between the site and the surrounding fields.
The main elements of the project were as follows:
Cognition successfully cleared 800 tonnes of asbestos sheeting and residual asbestos fragments found in soil and demolished all above ground structures, recycling all materials and producing compliant aggregates for reuse on site. In collaboration with NUVIA, our specialist nuclear subcontractor, all NORM features and hotspots were removed along with extensive underground pipework. Significant environmental enhancements were achieved throughout the project mitigating loss of bird nesting locations, tree replanting, establishment of new bat roosts and 98% of soil reuse on site.
Demolition and NORM works commenced in May 2019, and handover and demobilisation of site was achieved in February 2021. All Cognition’s works were planned and conducted with careful consideration of the surrounding community, environmental permitting and ecological constrains. Works were successfully completed, efficiently and effectively throughout, despite the challenge of the coronavirus pandemic during the works.